EXTRA 10% OFF
Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline Superlyte MTB Short - Steel Blue

Troy Lee Designs Flowline Superlyte MTB Short - Steel Blue

Regular price $96.00
Sale price $96.00
Troy Lee Designs Logo

EXTRA 10% OFF

AUTO APPLIES AT CHECKOUT
SHOP ALL DEALS
Color
Size

Product ID: GM031325-395

Earn

Only 1 Items Left

 

Shop all Troy Lee Designs   |   Shop all MTB Shorts

View full details

Description

Troy Lee Designs Flowline Superlyte MTB Short

Casual comfort meets trail-ready performance with the Flowline Superlyte MTB Short. Designed for all-day wear, this lightweight, breathable, and moisture-wicking short is perfect for both town and trail. Featuring 4-way stretch recycled fabric, a premium jacquard elastic waistband, and Bluesign®-approved materials, the Flowline Superlyte is built for comfort, sustainability, and performance.

Key Features

  • Lightweight & Breathable – Made from 89% recycled polyester and 11% spandex for unrestricted movement.
  • 4-Way Stretch Fabric – Moves with you for ultimate flexibility on and off the bike.
  • Moisture-Wicking & Quick-Dry Interior – Keeps you cool and dry during long rides.
  • Bluesign® Approved Materials – Environmentally friendly, sustainable fabric construction.
  • Premium Jacquard Elastic Waistband – Provides a secure and comfortable fit.
  • Mid-Knee Length (20 ¾" Outseam) – Ideal coverage for pedaling efficiency and casual style.
  • Functional Pockets – Two front pockets with bonded interiors for durability, plus a secure side pocket for your phone or essentials.
  • Locking YKK Zipper with Snaps – Secure and durable closure system.

Whether you're ripping through trails or cruising around town, the Flowline Superlyte MTB Short delivers effortless style, comfort, and performance.

You Might Also Like

Ratings & Reviews

>