SALE
Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Oasis Blue-Black

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Oasis Blue-Black

Regular price $69.99
Sale price $69.99 Was $119.00 Save 41%
Troy Lee Designs Logo
Color
Size

Product ID: BW012423-51

Earn

Only 1 Items Left

 

Shop all Troy Lee Designs   |   Shop all MTB Helmets

View full details

Description

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


You Might Also Like

Ratings & Reviews

>