Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt
Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt
Product ID: GM031325-853
Earn
Out of stock
Shop all Troy Lee Designs | Shop all MTB Gloves
View full detailsDescription
Troy Lee Designs Flowline MTB Glove
The Troy Lee Designs Flowline MTB Glove is built for comfort, ventilation, and performance, offering a lightweight feel with essential protection. Designed and tested by top athletes, this glove ensures optimal grip and control while keeping your hands cool on every ride.
Key Features
- Adjustable Velcro Cuff β Secure and customizable fit.
- Single-Layer Palm β Mapped laser perforations for enhanced breathability.
- Micro-Mesh Construction β Maximum airflow for all-day comfort.
- Touchscreen Compatibility β Use your devices without removing your gloves.
- Sublimated Graphics β Stylish and durable design.
Perfect for trail, enduro, and downhill riders, the Flowline Glove delivers a balanced mix of comfort, protection, and performance for every ride.
You Might Also Like
