Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline MTB Helmet - Point - Black-Charcoal

Troy Lee Designs Flowline MTB Helmet - Point - Black-Charcoal

Regular price $145.00
Sale price $145.00
Troy Lee Designs Logo

Color
Size

Product ID: HE5503

Earn
In stock - Ready to ship.
 

Shop all Troy Lee Designs   |   Shop all MTB Helmets

View full details

Description

Troy Lee Designs Flowline MTB Helmet

The Troy Lee Designs Flowline MTB Helmet delivers top-tier protection, comfort, and ventilation in a sleek, minimalist design—all at an affordable price. Engineered with Mips® B-Series Rotational Impact Protection, a full 360-degree fit retention system, and extended coverage, this helmet ensures premium safety and all-day comfort for trail riders.

Key Features

  • Mips® B-Series Protection – Reduces rotational forces in the event of a crash.
  • 3-Way Adjustable Screwless Visor – Easy customization for sun and debris protection.
  • Full 360° Fit Retention System – Secure, comfortable, and adjustable fit.
  • 14 Vents – Maximized airflow to keep you cool.
  • Full Wrap In-Mold Construction – Lightweight yet highly protective shell.
  • Extended Coverage – Increased protection for trail riding.
  • Side Strap Adjusters – Quick and easy fit adjustments.

With a Five-Star Safety Rating from Virginia Tech, the Flowline MTB Helmet is built for riders who demand reliable performance, comfort, and protection—without breaking the bank.

You Might Also Like

Ratings & Reviews

Overall rating: 0.0 / 5 from 0 reviews.

AI Generated Review Summary

Summary topics

Review topics: [].

Review highlights

Reviews

Q&A

Overall rating: 0.0 / 5 from 0 reviews.

AI Generated Review Summary

Summary topics

Review topics: [].

Review highlights

Reviews

Q&A

>