EXTRA 10% OFF
Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Gold-Black

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Gold-Black

EXTRA 10% OFF

Color
Size

Product ID: BW012423-61

Earn
Out of stock
 

Shop all Troy Lee Designs   |   Shop all MTB Helmets

View full details

Description

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


You Might Also Like

Ratings & Reviews

Overall rating: 5.0 / 5 from 5 reviews.

AI Generated Review Summary

Summary topics

Review topics: ["fit","color","helmet"].

Review highlights

Reviews

Fast delivery,arrived in perfect condition.

"Fast delivery,arrived in perfect condition."

Matthew H. (5/5)

Very lightweight helmet, feels great

"Very lightweight helmet, feels great but offers supreme protection and you can feel it! Great choice for the price!"

Alev S. (5/5)

Great fit. Very adjustable and

"Great fit. Very adjustable and very breathable. Adjustable visor helps for those long days on the trail."

Brian H. (5/5)

Nice Helmet

"Love the color, fits perfectly. So happy with my new helmet. Recommend!"

CRM L. (5/5)

Nice looking bike helmet

"The helmet sits very light on my large head and fit very comfortably. I like the matte finish high visibility color also."

JOHN D. (5/5)

Q&A

Overall rating: 5.0 / 5 from 5 reviews.

AI Generated Review Summary

Summary topics

Review topics: ["fit","color","helmet"].

Review highlights

Reviews

Fast delivery,arrived in perfect condition.

"Fast delivery,arrived in perfect condition."

Matthew H. (5/5)

Very lightweight helmet, feels great

"Very lightweight helmet, feels great but offers supreme protection and you can feel it! Great choice for the price!"

Alev S. (5/5)

Great fit. Very adjustable and

"Great fit. Very adjustable and very breathable. Adjustable visor helps for those long days on the trail."

Brian H. (5/5)

Nice Helmet

"Love the color, fits perfectly. So happy with my new helmet. Recommend!"

CRM L. (5/5)

Nice looking bike helmet

"The helmet sits very light on my large head and fit very comfortably. I like the matte finish high visibility color also."

JOHN D. (5/5)

Q&A

>