Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline SE MTB Helmet - Trooper - Titanium
Troy Lee Designs Flowline SE MTB Helmet - Trooper - Titanium
4 interest-free payments or as low as $15/mo with Affirm. Check your purchasing power
Product ID: GM031325-146
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Helmets
View full detailsDescription
Troy Lee Designs Flowline SE MTB Helmet
The Troy Lee Designs Flowline SE MTB Helmet combines cutting-edge safety, premium comfort, and a sleek minimalist design to deliver top-tier performance for trail riders and eMTB enthusiasts. Equipped with Mips® B-Series Rotational Impact Protection, an extended coverage shell, and a Five-Star Safety Rating from Virginia Tech, this helmet ensures unmatched protection on every ride.
Key Features
- Mips® B-Series Protection – Reduces rotational impact forces in the event of a crash.
- eMTB Certified – Built for high-speed, high-intensity rides.
- 3-Way Adjustable Screwless Visor – Easily customized for sun and debris protection.
- Full 360° Fit Retention System – Adjustable for a secure and personalized fit.
- 14 Vents – Optimized airflow for maximum cooling.
- Full Wrap In-Mold Construction – Lightweight, durable, and impact-resistant.
- Fidlock® Magnetic Buckle System – Quick and secure one-handed closure.
- Side Strap Adjusters – Easy, on-the-go fit adjustments.
For riders who demand top-tier safety, comfort, and ventilation, the Flowline SE MTB Helmet is a performance-driven trail essential, designed to keep you cool, comfortable, and protected on every adventure.
You Might Also Like
You Might Also Like
- Troy Lee Designs Flowline SE MTB Helmet - Badge - Tarmac-Oak Troy Lee Designs$159.99★★★★★2 review(s)
- Giro Source MIPS MTB Helmet - Matt Black Static Giro$129.95
- Smith Forefront 2 MIPS MTB Helmet - Matt Spruce-Safari Smith40% off$149.99$250.00★★★★★5 review(s)
- 7 iDP Project 21 Trail MTB Helmet - Matt Black 7 iDP$149.99
- Giro Source MIPS MTB Helmet - Matt Dusty Rose Cosmic Giro$129.95
- 6D Helmets ATB-2T Ascent Trail MTB Helmet - Matt White Black 6D Helmets15% off$169.95$199.95★★★★★3 review(s)
- 661 Recon Scout MTB Helmet - Orange SixSixOne43% off$39.99$69.99★★★★★8 review(s)
- Bell 4Forty Air MIPS MTB Helmet - Matt Black Camo Bell$149.95★★★★★1 review(s)
- Troy Lee Designs A3 MIPS MTB Helmet - Uno Red Troy Lee Designs35% off$149.99$230.00★★★★★4 review(s)
- Bell Sixer MIPS MTB Helmet - Matt Blue-Black Bell47% off$89.99$170.00★★★★★6 review(s)
- 661 Evo AM Patrol MTB Helmet - Deep Navy SixSixOne55% off$49.99$109.99
- Troy Lee Designs A3 MTB Helmet - Intake - White Troy Lee Designs$249.99
- Bell Super Air Spherical MTB Helmet - Matt Cement Gray Bell$234.95
- Fox Racing Dropframe MTB Helmet - Hunter Green Fox Racing$224.95★★★★★1 review(s)
- 6D Helmets Alterra MTB Helmet - Segment - Slate Blue 6D Helmets$395.00
- POC Axion Spin MTB Helmet - Uranium Black-Flourite Green Matt POC33% off$99.99$150.00
- Giro Fixture MIPS II MTB Helmet - Womens - Matt Black-Pink - 2024 Giro$74.95
- Fox Racing Speedframe Pro MTB Helmet - Greg Minnaar - ADB Fox Racing$199.95
- Troy Lee Designs Flowline SE MTB Helmet - Badge - Pinstripe - Charcoal-Black Troy Lee Designs$159.99★★★★★2 review(s)
- Lazer Lupo Kineticore MTB Helmet - Matte Fern Lazer$74.99